Three Valleys Water
Keystone Ecology carried out a Phase I Habitat Survey of the proposed route of a new trunk main to service Wembley Stadium. The aim of the survey was to identify features of ecological interest, undertake a basic search of habitats present for evidence of use, or potential use, by scheduled species, and identify any other possible ecological constraint to the proposed scheme. The survey area was a 3.6km linear route in central London.
This entry was posted in Case Studies, Ecology, Utilities. Bookmark the
permalink. Both comments and trackbacks are currently closed.
Ecology Surveys for Wembley Trunk Main
Three Valleys Water
Keystone Ecology carried out a Phase I Habitat Survey of the proposed route of a new trunk main to service Wembley Stadium. The aim of the survey was to identify features of ecological interest, undertake a basic search of habitats present for evidence of use, or potential use, by scheduled species, and identify any other possible ecological constraint to the proposed scheme. The survey area was a 3.6km linear route in central London.